Private AI. Owned clean energy. Room to grow at Muxaro.Discuss your allocation

Existing Infrastructure

The foundations.
Already in place.

Owned land. Owned power generation. Secured grid connectivity. At Muxaro, the physical foundations for our first AI factory are already here.

01Land we own.

Muxaro sits on land owned within our group. It is one of our assets across Italy, providing a site we control for the first deployment and future phases.

Owned land · Existing site

02Power we generate.

Our solar generation is already operating at Muxaro. We own the generation assets alongside the planned AI factory.

The campus targets approximately 40% of its total annual energy needs from our own behind-the-meter clean power, complemented by grid supply.

Owned generation · Operating today

03Grid access. Secured.

We own the site’s grid-connection infrastructure, and grid access for the first allocation is already secured. The physical connection is in place.

Muxaro’s first deployment uses this existing connection, avoiding the need to develop a new grid connection from scratch.

Secured access · Existing connection

04A head start for AI.

Owned land, operating generation and an existing grid connection let us focus on delivering the AI factory: modular facilities, GPU installation and commissioning.

Reusing these foundations avoids the long lead times associated with developing a new site-level energy connection. It is the starting point for our first allocation.

Explore the first allocation
Visualization of the planned Muxaro AI factory within the campus solar landscape

The Muxaro starting point

Three foundations.
One integrated platform.

Land
OwnedThe site is already part of our portfolio.
Power generation
OwnedOur solar assets are already operating.
Grid connectivity
SecuredThe connection infrastructure is in place.

Now, the AI factory.

The land, generation and grid-connection foundations exist today. AI capacity is the next deployment, with facility integration, equipment delivery and commissioning defining the final service date.

Reserve the first allocation